MonuGrid® Foundation System
No Concrete.
No Waiting.
No Call-Backs.
The engineered geocell foundation system that installs faster, performs longer, and takes the hard work out of monument and marker setting — in any season, on any soil.
What is MonuGrid®?
The Upgrade the Industry Has Needed.
MonuGrid® uses an interlocking geocell confinement structure to distribute load across a wider surface area — the same reinforced soil principle used in major civil infrastructure worldwide, now purpose-built for cemetery foundations.
Unlike concrete, MonuGrid® doesn't require curing, doesn't crack, and doesn't heave. It installs in under an hour with no special tools, no mixing, and no mess.
It's not a workaround. It's the upgrade.
What is MonuGrid®?
Less manual labor. Immediately increases productivity.
Do more in less time.
Installs in under an hour
What used to take a full day now takes less than an hour. Complete more installations and send your crew home on time.
Works in any weather
No curing means no delays. Install in summer heat or winter cold — MonuGrid® performs the same every time.
No mixing. No concrete bags.
Forget the 80-pound bags and the mixer. MonuGrid® is clean, lightweight, and easy to handle — reducing strain and injury risk.
No special tools or training
Fully proficient in under an hour. No specialized equipment, no certifications — just a system that works right away.
Stays level season after season
Geocell confinement technology resists frost heave — virtually eliminating re-leveling call-backs for good.
Clean jobsite every time
No concrete residue, no overspill. Leave every site looking as respectful and professional as the occasion demands.
MonuGrid® vs. Concrete
The Numbers Don’t Lie.
| MonuGrid® | Conventional Concrete | |
|---|---|---|
| Installation time | Under 1 hour | 5.5+ hours per foundation |
| Weather dependency | None — all-season | Requires dry conditions + cure time |
| Frost heave resistance | Engineered confinement | Prone to movement & cracking |
| Service life | 50+ years engineered | Variable — prone to settling |
| Environmental impact | Concrete-free, low carbon | High CO₂, carbon-intensive |
| Call-backs for re-leveling | Virtually eliminated | Common — ongoing OpEx cost |
| Training required | Less than 1 hour | Experienced crew required |
| 10-year TCO | 25% lower than concrete | Baseline comparison |